By setting up SS-2h St1 and SS-3h stimulation campaign

Spread the love

Highlights

  • Tasabrah Sow Nandae Southeth South: SS-2 Waletrack (SS-2-H-3H) wells in ECC
  • The Company is planning to cancel between 119 stimuli levels to 119 stimulus standards between the two wells. SS-2h St1 Garda is planned to include 43 steps of 5,425-foot (1,656-foot) and the SS-3H salvation is intended to include 76 levels in the aiming room.
  • The campaign is under-free 80,000 hydraulic horse (HPP) to the American Batilo Basin.
  • Volunteer 1: Compassion from freeness tools, compared with freeness tools. All levels are installed by the water fluid pattern.

New York – (a magic wire) –Tamborah Resources Corporation Administrator Joel’s puzzle,

Benoo power Benoo power Benolo Basin Basin Basin Basin Basin and SS -3-SS-3h wells are happy to start a stimulation program. If the horse of this device is completed in the pushed, a step is expected to provide a change in the efficiency and proposals compared to the previous wells.

This stimulation campaign is planned with 119 steps to 119 steps up to 119 steps to 119 steps, which is intended to 119 steps in ~ 127 feet away.

Necessity, which protects are expected to provide reliable power in the northern ten, and the productivity of the productivity

In the past two years, we have successfully conducted stimulation programs in the Ammonig 2h (2022/23) and She Nandro South 1 H (2023/200). This experience gives us self-evident ability to engage in safe and effectively each year.

Tamboran Resources Corporation

Forty 672 879 024
Tower, Worldwide Tower
Site 1, Step 39, 100 butSooooo Avenue, Botanrososo NSW 2000, Australia
+ 6330 6626 www.tmamborn.com

The proposed SS -2H ST1 and SS -3- compared to SS-1h)

all right

SS-1H

SS-2H ST11

SS-3h1

Lengers of rear of the last (legs)

1,640

5,427

9,766

Strength levels (#)2

10

43

76

Average gaps (feet)

164

126

128

Strengtry Strength (LB / FT)

2,212

2,880

2,820

Average sand in one level (lb)

355,997

373,608

373,608

Used devices

Condoms power

The power of freedom

The tool horse (HHP)

40,000

80,000

Description of SS-1h wells from SS-1H pit if it has been completed from SS-1/2 since 2/23.

Deceives one’s stimulation.

EP 98/117 Interests

Company

Interest

Tamrarara (B2) Pty Limit1

77.5%

Falcony oil and gas Australia limited (Fonco

22.5%

Total (EPA 🙂

100.0% of

She Native South -2 Fragary Says (DSus) “46,080-Electric2

Company

Interest

Tamrarara (B2) Pty Limit1

95.0% of

Falcony oil and gas Australia limited (Fonco

5.0%

Total

100.0% of

1Tamban (B2) 50% of the NYNEARD (100%) of the NYNEARD (100%) of the NYNEARD (100%) of the NYNEARD (100%) of the Mercator is strong as administration. Tamborara (B2) is operating operator by behalf of common work.

SS-2H ST1 and SSS on SE Native South Pad 2 -3- 3h Wales finish 2Subder

This announcement was issued by Joel’s puzzle primarily for the guards of Timboran’s resources to leave and leave the guards.

About Tamboran’s Resources Corporation

Timborara’s resources in Great rural Basin in the Great Government in the Narrative Northern State.

Timraurant’s key resources are 100% in EPS 98, 117 and 76 All 100% in EPS 98 and 76 All 100% in EPS 98 and the Operator in EPS 98 and Operator with 100% of the operator.

Teaching

Tamborah, any external statements or any of any results, is not verification, verification, or insurance, verification, or insurance, verification or guarantee. The expressions in this account will be cleansed by those who are owned by this document on this document. If necessary, Tamboraran is important or any obligation or obligation to the future of comments or future funding for the future, or the future of the future.

The information contained in this notice does not take into investment goals, financial status, or any recipient needs, and not financial production. Before making investment decisions, need to consider their own interests and situation before making it necessary and need independent professional advice if needed. The accuracy, representation, or reliability of the information contained in legal, tamborara and officers, staff, representatives, representation, representation, or reliability in this presentation. Additionally, the Tambora or Ochods, Agents, agents, or any contact with any of any kind of important importance, agents, or any contact with any of the same importance, or in relation to this notice.

Notice in future statements

The In 1934, in a modified 1933 warrantial law In 1934, a transitional law in the modified navigation In 1934, the newspaper statements associated in the modified warranty in 1934 The future features reflect current needs and forecasts of the future and then include unrest and danger. Believe, expect, wishes, permission, permission, plan, plan, plan, plan, plan, plan, plan, , ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ, ማቀድ , Planning, evaluate.

Although not limited, the drug development may vary when there is no use of different reasons. It is based on the highest capital of our business support, to build up acceptable contracts, to deliver the Australian East Coast of Australia. Revenue absences and the amount of regulations that include significant expenses or technologies that affect your physical environment, which includes significant cost or technologies that affect your physical location or holders, in the market Excessive equipment and infrastructure, which may affect our work and exchange rate, which can affect our work, natural gas prices and resources The focus of our members and operations of all personality and procedures on financial and volunteers related to our mid-largest projects, the atmosphere and negative effects of businesses that can lead us to family work. When we smoke, cooperative employers, and sum of the sum of the sum of the summer net is raised. Laws and laws that can affect our expenses and how to affect our lifestyle; Community protests that may result in the most expensive delay and the ability to access essential public sufficiency; Zero’s goals, in accordance with internal goals, in the start of the law, and in the country of the natural zero because of the start of the natural zero, in the start of the national zero, in a natural zero. It is interesting to note that which you can have a profound effect on SSG issues and environmental measures. Accidents related to the organization structure; The dangers associated with a common stock and the cyrus; And the other risk factors discussed in this account is mainly and mainly with the Commission.

It is impossible to predict or identify all these things. Any shipments in this document are based on specific estimates and analytics with historical trends, current procedures, expectations, and other factors. Employment Descriptions are not guaranteed in future implementation and the right results or developments may differ material. The company is constantly investigated with trends and uncertainments that affect the company’s operation and financial state, update or meeting any obligation to update or meet any suggestions in this document.

Investors Questions:
Chris MATBEY, Vice President “Corporate Development and Investors Communities
+ 6330 6626
@Tamboroon

Media Questions:
+ 6330 6626
Media @ Tamarrararaare

Source: Tambar Resources Corporation