She hired the cassocole to swallow up in the cassocoe for the 8th day for Japanese Driver
Freedom has drunk the truck, after the health and safety of four days in Japan, four days in Japan.
If a 74-year-old driver is known, he was baptized early during Tokyo, Tuesday, when it was busy in Tokyo, Tuesday.
It is already connected to saving workers and respond to the Tuesday afternoon.
They are working around the man to the man’s mortal hour. They were able to reboot the truck from the colt, but the truck is buried under injustice and soil.
When we first created, the kiss was the amount of swimming pool and approximately 33 feet, and 20 feet depth. But unstable land, water pipes, and damaged debris was about four times to grow four times.
The inside is running out of It’s going to be big every dayAn official, an official, an official of the animal sewage draf of the animal sewage, Crame Synuel.
Get national news every day
Get the main news of day, political, economic and current issues headline, send it to your inbox once a day.
The hole is believed to be due to a groundwater pipes. If the corrupt pipe was dirty litter, the second sehan will make the second sehan on Thursday.
In accordance with the guardian, employees are now changing techniques, and they are starting to build a 30-meter-long rack They hope to get to someone.
Heavy devices “Our local chief of our area, Tetriji Satur, the banking space to be built The operation around the “most dangerous” around Hinkl.
Meanwhile, the residents of the area in the nearby area are obedient to the nearby area, and the surrounding people were diminished by 1.2 million people to prevent water sewage water. The hole.
Once kiosid is complete in the area of the local newsletter, heavy devices will move into the hole and can enter the hole to continue their search.
When the driver left, experts enter the embarrassment and explore the sewer system.
The Murning Systems of the land, infrastructure and transportation ordered the drainage diagnosis. In one of the most risk of the world, the buyer raised the anxiety about aging infrastructure.
The In the 1960s and the 1970s of the 1970s, most of the Japanese public infrastructure has built. The sewage pipe in Jiashro is about 40 years.
– – With a file with dressing press
& Copy 2025 International News, Common’s Entertainment Inc.